Dhalai

Dhalai is the pour itself, the day fresh concrete goes into the shuttering and around the tied reinforcement, whether that is a niv, a column or the chhat overhead.

  • Glossary
  • 36 words explained
  • Own delivery, 34 blocks
  • Open all 7 days

In EnglishConcreting, casting

The word covers every stage that ends in a pour, a niv dhalai, a column dhalai or a chhat dhalai, and it names the day rather than the material. A chhat dhalai is reinforced concrete, so the cement bought for it has to be one written for that work: OPC under IS 269:2015, PPC under IS 1489, Portland slag under IS 455, or composite cement under IS 16415, and masonry cement is kept off it entirely.

Once the pour is done, curing is the separate stage that follows it, keeping the concrete wet while it gains strength; dhalai is the day the concrete goes in, not the days after it. Sariya, tar and the right cement all have to be on site together before the dhalai, because running out of any one of them midway is the harder mistake to fix.

How the date is fixed at the counter

Kal chhat ki dhalai hai, sariya aur cement dono confirm kar dijiye.

Tomorrow is the roof pour, confirm both the TMT and the cement. The date and the two materials are said together; the cement type and the sariya diameter still need naming on the call.

Contact

Confirm the cement type before the pour

Tell us which dhalai it is, niv, column or chhat, and we match the cement and the sariya to it.

Shop hours: All 7 days, 9:30 AM to 6:00 PM